summaryrefslogtreecommitdiffstats
path: root/doc/html/tutorial2-06.html
diff options
context:
space:
mode:
authorTimothy Pearson <kb9vqf@pearsoncomputing.net>2011-12-05 22:04:08 -0600
committerTimothy Pearson <kb9vqf@pearsoncomputing.net>2011-12-05 22:04:08 -0600
commite02e31c8b9d854cd62cbe9799228f6e08e882773 (patch)
tree53303c981d0b20e03c5a2fc8e959fa74adcb90d1 /doc/html/tutorial2-06.html
parent143f194af098d44bf0dd1ebb29e59f30ce48d523 (diff)
downloadtqt3-e02e31c8b9d854cd62cbe9799228f6e08e882773.tar.gz
tqt3-e02e31c8b9d854cd62cbe9799228f6e08e882773.zip
Sync with latest script
Diffstat (limited to 'doc/html/tutorial2-06.html')
-rw-r--r--doc/html/tutorial2-06.html2
1 files changed, 1 insertions, 1 deletions
diff --git a/doc/html/tutorial2-06.html b/doc/html/tutorial2-06.html
index c126b1899..09dab5723 100644
--- a/doc/html/tutorial2-06.html
+++ b/doc/html/tutorial2-06.html
@@ -114,7 +114,7 @@ TQt rather than good (or bad) algorithms for drawing charts.
</pre>
<p> To draw a horizontal bar chart we need the array of scaled values, the
total value (so that we can calculate and draw percentages if
-retquired) and a count of the number of values.
+required) and a count of the number of values.
<p> <pre> double width = m_canvas-&gt;width();
double height = m_canvas-&gt;height();
int proheight = int(height / count);